Mathematics
Mathematics, 02.03.2020 01:48, whiplash40

Infotron Inc makes electronic hockey and soccer games. Each hockey game requires 2 labor-hours of assembly and 2 labor-hours of testing. Each soccer game requires 3 labor-hours of assembly and 1 labor-hour of testing. Each day there are 44 labor-hours available for assembly and 32 labor-hours available for testing. How many of each game should Infotron produce each day to maximize its total daily output?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:40, fdzgema17
An apartment has a replacement cost of $950,000 and contents valued at $1,450,000. it has a classification of a and a territory rating of 3. find the annual premium a) $10,185 b) $9,230 c) $3,155 d) $13,830
Answers: 2
image
Mathematics, 21.06.2019 19:10, niyah2x3
What are the coordinates of the point that is 1/3 of the way from a to b? a (2,-3) b (2,6)
Answers: 3
image
Mathematics, 21.06.2019 21:30, ayoismeisalex
Taylor wants to paint his rectangular deck that is 41 feet long and 24 feet wide. a gallon of paint covers about 350 square feet. how many gallons of paint will taylor need to cover the entire deck? round your answers to two decimal places when necessary.
Answers: 1
image
Mathematics, 22.06.2019 01:30, alott1121
(01.02 mc) asap plzzzwhich of the following correctly simplifies the expression 3 to the power of 2 multiplied by 5 to the power of 0 whole over 4, the whole squared.? select one: a. 3 to the power of 2 multiplied by 1 whole over 4, the whole squared. = 3 to the power of 1 multiplied by 1 squared over 4 squared. = 1 over 6.b. 3 to the power of 2 multiplied by 0 whole over 4, the whole squared. = 3 to the power of 4 multiplied by 0 over 4 squared. = 0c. 3 to the power of 2 multiplied by 0 whole over 4, the whole squared. = 3 to the power of 1 multiplied by 0 over 4 squared. = 0d. 3 to the power of 2 multiplied by 1 whole over 4, the whole squared. = 3 to the power of 4 multiplied by 1 squared over 4 squared. = 81 over 16.
Answers: 1
Do you know the correct answer?
Infotron Inc makes electronic hockey and soccer games. Each hockey game requires 2 labor-hours of as...

Questions in other subjects: