Mathematics
Mathematics, 29.08.2019 21:30, MrSavannahCat

Asawmill runs for three 4-hour shifts per day. it produces 500 2x4's per hour, which are divided into 50 piece bundles automatically. if a forklift operator is able to load 10 bundles of 2x4's per hour, how many hours will it take the operator to load a full day of production?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, cherish14
What could explain what happened when the time was equal to 120 minutes
Answers: 2
image
Mathematics, 21.06.2019 22:30, badpotterchris
60 musicians applied for a job at a music school. 14 of the musicians play both guitar and drums. what is the probability that the applicant who gets the job plays drums or guitar?
Answers: 1
image
Mathematics, 22.06.2019 03:00, tasiaandrews123
A. the probability that a product is defective is 0.1. what is the probability that there will be 1 or less defective products out of the next 8 produced products b. the expected number of imperfections in the coating nylon for parachutes is 6 per 100 yards. what is the probability of finding 12 or fewer imperfections in 260 yards c. in a lot of 54 products there are 9 defective products. calculate the probability that not more than 1 is defective from a random sample of 17 products.
Answers: 1
image
Mathematics, 22.06.2019 03:30, tracyaleblanc
The area of a square floor on a scale drawing is 64 square centimeters, and the scale drawing is 1 centimeter: 3 ft. what is the area of the actual floor? what is the ratio of the area in the drawing to the actual area? the area of the actual floor is square feet. the ratio of the area in the drawing to the actual area is 1 square centimeter: square feet.
Answers: 3
Do you know the correct answer?
Asawmill runs for three 4-hour shifts per day. it produces 500 2x4's per hour, which are divided int...

Questions in other subjects:

Konu
English, 03.03.2021 03:10