Mathematics
Mathematics, 26.02.2020 17:39, ayoismeisjjjjuan

A PERT analysis of a small project determined that the duration of the critical path is 10 weeks with a variance of 2 weeks. What project duration can be promised that will have only a 5% chance of time overrun?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:40, Reijected
The transitive property of equality states that: o if a = b, then bra o if a = b, then ac = bc o if a = b and b= c, then a = if a = b and c= c, then a + b = b + c
Answers: 2
image
Mathematics, 21.06.2019 17:00, nataliemoore1974
Explain how you do each step what term makes it inconsistent y=2x - 4 ?
Answers: 1
image
Mathematics, 21.06.2019 21:50, lucifer6669
What is the product? a-3/15a × 5/a-3
Answers: 1
image
Mathematics, 22.06.2019 03:00, Delgadojacky0206
L2.8.2 test (cst): triangles in the figure, pq is parallel to rs. the length of rp is 5 cm; the length of pt is 30 cm; the length of q7 is 60 cm. what is the length of so? o a. 20 cm 0 0 o b. 6 cm o c. 10 cm od. 2 cm 0 previous
Answers: 2
Do you know the correct answer?
A PERT analysis of a small project determined that the duration of the critical path is 10 weeks wit...

Questions in other subjects:

Konu
Mathematics, 23.04.2021 04:00