Mathematics
Mathematics, 21.02.2020 19:45, samaragreen34

(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallons per day completed 2013 in Wichita, Kansas was $6.5 million. It was proposed that a similar treatment plant with a capacity of 80 million gallons per day be built in Los Angles, California, for completion in 2020. For the additional information given below, perform an order of magnitude estimate of the cost of the proposed plant using the following steps in order (a) to (f): a. In the total construction cost for the Wichita, Kansas plant, there was an item of $0.5 million for site preparation which is not typical for similar plants. b. The variation of sizes of the refineries can be approximated by the cost-capacity factor with m

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, Jenifermorales101
It is given that the quadratic equation hx²-3x+k=0, where h and k are constants, has roots [tex] \beta \: and \: 2 \beta [/tex]express h in terms of k
Answers: 2
image
Mathematics, 21.06.2019 22:30, tiannaetzel
Which of the following is an example of a rational number? a. π b. √ 9 c. √ 8 d. 3.8362319
Answers: 1
image
Mathematics, 21.06.2019 23:00, teriateria
How can writing phrases as algebraic expressions you solve problems?
Answers: 2
image
Mathematics, 22.06.2019 01:00, emory238
Calculate the total payback for a $3,500 loan at 8% annual interest with monthly payments for two years. show all of your steps. use the formula, m = pm(1 + m)^na/(1 + m)^na - 1, as needed.
Answers: 1
Do you know the correct answer?
(30 pts) The total construction cost of a sewage treatment plant with a capacity of 50 million gallo...

Questions in other subjects:

Konu
French, 27.03.2020 16:21