Mathematics
Mathematics, 21.02.2020 17:31, alvaradorosana05

A worker takes a random sample of 150 bolts and finds that 18 of them are either too long or too short, thus making them unusable. Estimate the number of unusable bolts in a production of 11,000 bolts.

1,320 bolts
860 bolts
340 bolts
450 bolts

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, bellagracebulle8018
Me what is the value of x? showing work would be appreciated - ! : )
Answers: 1
image
Mathematics, 21.06.2019 15:20, heyrosaphoto3159
The speed of a falling object increases at a constant rate as time increases since the object was dropped. which graph could represent the relationship betweent time in seconds, and s, speed in meters per second? speed of a falling object object over time
Answers: 1
image
Mathematics, 21.06.2019 18:00, rosenatalie222
In triangle △abc, ∠abc=90°, bh is an altitude. find the missing lengths. ah=4 and hc=1, find bh.
Answers: 1
image
Mathematics, 21.06.2019 19:20, kkmoney
Will give brainliest immeadeately true or false: the origin woud be included in the solution set for the inequality: y< 2x-5
Answers: 1
Do you know the correct answer?
A worker takes a random sample of 150 bolts and finds that 18 of them are either too long or too sho...

Questions in other subjects:

Konu
Mathematics, 05.05.2020 17:15
Konu
Mathematics, 05.05.2020 17:15
Konu
Mathematics, 05.05.2020 17:16