At a sand and gravel plant, sand is falling off a conveyor and onto a conical pile at a rate of 16 cubic feet per minute. the diameter of the base of the cone is approximately three times the altitude. at what rate is the height of the pile changing when the pile is 12 feet high? (hint: the formula for the volume of a cone is v = 1 3 πr2h.)
The fraction of defective integrated circuits produced in a photolithography process is being studied. a random sample of 300 circuits is tested, revealing 17 defectives. (a) calculate a 95% two-sided confidence interval on the fraction of defective circuits produced by this particular tool. round the answers to 4 decimal places. less-than-or-equal-to p less-than-or-equal-to (b) calculate a 95% upper confidence bound on the fraction of defective circuits. round the answer to 4 decimal places. p less-than-or-equal-to