Mathematics
Mathematics, 20.02.2020 07:40, bellamuniz2015p23zr7

16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on average once every 20 cycles. When a line stop occurs, average downtime is 3.0 min. Cost of each starting work part is $1.55, and the cost to operate the line is $66/hr. Tooling cost is $0.13 per work part. Determine (a) average hourly production rate, (b) line efficiency, and (c) cost of a workpiece produced.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, skylarjohnson2683
What is true about the dilation? it is a reduction with a scale factor between 0 and 1. it is a reduction with a scale factor greater than 1. it is an enlargement with a scale factor between 0 and 1. it is an enlargement with a scale factor greater than 1.
Answers: 2
image
Mathematics, 21.06.2019 16:50, dee1334
Line l passes through points (0,4) and (3,6) what is the slope of a line that is parallel to line l -2/3 -3/2 2/3 3/2
Answers: 1
image
Mathematics, 21.06.2019 18:00, hello6975
Which statement about the relative areas of δabc and δxyz is true? the area of δabc > the area of δxyz the area of δabc < the area of δxyz the area of δabc = the area of δxyz more information is needed to compare.
Answers: 1
image
Mathematics, 21.06.2019 23:00, travisvb
What unit of been sure would be appropriate for the volume of a sphere with a radius of 2 meters
Answers: 2
Do you know the correct answer?
16.4 A 12-station automated production line has an ideal cycle time of 24 sec. Line stops occur on a...

Questions in other subjects:

Konu
Mathematics, 25.03.2021 22:00
Konu
Mathematics, 25.03.2021 22:00