Paul can install a
300-square-foot hardwood floor in 18 hours. matt can install the same
...
Mathematics, 20.08.2019 18:00, janetshirinyan
Paul can install a
300-square-foot hardwood floor in 18 hours. matt can install the same
floor in 22 hours. how long would it take paul and matt to install the
floor working together?
4 hours
9.9
hours
13.2 hours
30
hours
Answers: 1
Mathematics, 20.06.2019 18:02, johnisawesome999
Germaine walks at the rate of 10 feet every five seconds while nolan walks at the rate of 15 feet every five seconds. if germaine has a head start of 25 feet, how many seconds will they be at the same spot?
Answers: 1
Mathematics, 03.04.2020 17:04
English, 03.04.2020 17:04