Mathematics, 07.01.2020 08:31, SMURFETTE86
Abicycle factory installs about 400 tires per day. tires are installed monday through friday for 8 hours per day. the manager of the factory estimates the number of properly installed tires per week using the process below.
in the first hour of work on monday, 49 out of 50 tires were properly installed.
so, there were about 8(49) = 392 properly installed tires on monday.
considering 5 working days per week, 5(392) = 1,960 is the number of tires properly installed in one week.
which best explains the validity of the results?
Answers: 3
Mathematics, 21.06.2019 19:20, SmolBeanPotato
Aefg - almn. find the ratio of aefg to almn. a)1: 4 b)1: 2 c)2.1 d)4: 1
Answers: 1
Mathematics, 21.06.2019 20:00, christpress0
Given the equation y − 4 = three fourths(x + 8) in point-slope form, identify the equation of the same line in standard form. −three fourthsx + y = 10 3x − 4y = −40 y = three fourthsx + 12 y = three fourthsx + 10
Answers: 1
Mathematics, 21.06.2019 20:00, carltonwashington23
The midpoints of the sides of the large square are joined to form a smaller square. what is the area of the smaller square
Answers: 1
Mathematics, 21.06.2019 22:30, dancer4life5642
Question 3(multiple choice worth 1 points) use the arc length formula and the given information to find r. s = 16 cm, θ = 48°; r = ? sixty divided by pi cm thirty divided by pi cm one third cm one hundred twenty divided by pi cm
Answers: 1
Abicycle factory installs about 400 tires per day. tires are installed monday through friday for 8 h...
Health, 27.03.2020 01:20
Mathematics, 27.03.2020 01:20