Mathematics
Mathematics, 04.01.2020 21:31, ariano76

Ben, tim, and sam have to do a certain job. ben can finish the job in 5 hours. tim can finish the job in 6 hours. sam can finish the job in x hours. the three of them can finish the job in 2 hours if they work together. find x.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, m4167281
Achemist has 200 ml of a 10% sucrose solution. she adds x ml of a 40% sucrose solution. the percent concentration, y, of the final mixture is given by the rational function: the chemist needs the concentration of the final mixture to be 30%. how many milliliters of the 40% solution should she add to the 10% solution to get this concentration?
Answers: 1
image
Mathematics, 21.06.2019 17:00, july00
Consider the function represented by the equation 1/2 j + 1/4 k equals 3 which shows the equation written in function notation with j as the independent variable
Answers: 1
image
Mathematics, 21.06.2019 20:30, Lilshawn1
Linda loans her friend $250 with a 5% monthly intrest rate. how much was the whole loan?
Answers: 1
image
Mathematics, 21.06.2019 22:10, ava789
Find the volume of the solid whose base is the region bounded by f(x), g(x) and the x-axis on the interval [0, 1], and whose cross-sections perpendicular to the y-axis are squares. your work must show the integral, but you may use your calculator to evaluate it. give 3 decimal places for your answe
Answers: 3
Do you know the correct answer?
Ben, tim, and sam have to do a certain job. ben can finish the job in 5 hours. tim can finish the jo...

Questions in other subjects:

Konu
Mathematics, 05.01.2020 05:31
Konu
Mathematics, 05.01.2020 05:31