Suppose that for example 15.1, the gas-processing plant decides to produce a third grade of product with the following characteristics: supreme raw gas 15 m3/tonne production time 12 hr/tonne storage 5 tonnes proļ¬ t $250/tonne in addition, suppose that a new source of raw gas has been discovered so that the total available is doubled to 154 m3/week.
(a) set up the linear programming problem to maximize profi t.
(b) solve the linear programming problem with the simplex method.
(c) solve the problem with a software package.
(d) evaluate which of the following options will raise profi ts the most: increasing raw material, storage, or production time.
Answers: 1
Mathematics, 21.06.2019 17:00, eazywalters
There is a spinner with 14 equal areas, numbered 1 through 14. if the spinner is spun one time, what is the probability that the result is a multiple of 2 or a multiple of 5?
Answers: 2
Suppose that for example 15.1, the gas-processing plant decides to produce a third grade of product...
Mathematics, 13.07.2019 07:10
Spanish, 13.07.2019 07:10
Mathematics, 13.07.2019 07:10
History, 13.07.2019 07:10