Introduction all of you have had at least an introduction to earned value management in the project management fundamentals course. many of you may have had the opportunity to use earned value management in your professional careers. in practice, most evm analysis results are generated by scheduling software or other applications. as a project manager, you must have a good handle on the concepts and be able to verify the accuracy of evm analysis results. in this assignment, you will have an opportunity to brush up and expand upon your evm knowledge and skills by applying evm concepts to a practical problem. this assignment requires a manual analysis - do not use microsoft project. problem background your project consists of seven activities with planned start and finish dates shown in the chart below: activity budgets and earned value (ev) accrual rules from you project cost management plan are as follows: assumptions 1. assume a five-day work week with no holidays occurring during the work week. 2. for all activities (except activities 3 and 4), assume the expenditure rate is constant over the duration of the activity, i. e., the amount planned to be spent each week is the same. see the conceptual profile below. 3. for activity 3, the planned expenditure profile is shown below: 4. for activity 4, the planned expenditure profile is shown below: the project sponsor wants you (the pm) to present a project cost and schedule performance assessment using data through the end of week 8: for activity 1, three equally-valued gates have been established and all gates are complete as of the end of week 8. for activity 3, five milestones have been established with the following values: (1) milestone 1 – 10%; milestone - 20%; milestone 3 – 15%; milestone 4 -20%; milestone 5 – 35%. four of the milestones are complete as of the end of week 8. for activity 4, four equally values gates (milestones) have been established. as of the end of week 8, none of the gates have been reached but the activity owner estimates 30% of the work required to reach the first gate has been accomplished. answer the questions that follow. show all work. round dollar values to the nearest dollar. calculate all other variables to three decimal places. 1. earned value measures a. calculate earned value measures for each activity and for the cumulative project as of the end of week 8; fill in the table below: activity planned value (pv) earned value (ev) actual cost (ac) activity one 22,000 activity two 25,000 activity three 40,000 activity four 8,000 activity five 0 activity six 0 activity seven 0 entire project 2. earned value performance measures a. calculate earned value performance parameters for each activity and for the cumulative project as of the end of week 8; fill in the table below: activity schedule variance (sv) schedule performance index (spi) cost variance (cv) cost performance index (cpi) activity one activity two activity three activity four activity five activity six activity seven entire project

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:30, pinkygirlp1662
The triangle shown has a hypotenuse with a length of 13 feet. the measure of angle a is 20 degrees. and the measure of angle b is 70 degrees. which of the following is closest to the length, in feet, of line segment ac? no need to use a calculator to find the trig numbers. each function is listed below. 4.4 5 12.2 35.7
Answers: 2
image
Mathematics, 22.06.2019 01:00, Funkyatayo
Given that δabc is similar to δdef, which is a possible trigonometric ratio for ∠d? a) tan d = 24 30 b) tan d = 30 24 c) tan d = 18 24 d) tan d = 24 18
Answers: 2
image
Mathematics, 22.06.2019 01:20, attic
If x varies directly as y, and x = 7.5 when y = 10, find x when y = 4
Answers: 1
image
Mathematics, 22.06.2019 02:10, genyjoannerubiera
The key on a road map has a scale factor of 1.5 inches = 50 miles. the distance between santa fe and albuquerque measures 7.5 inches. the distance between santa fe and taos is 0.75 inches. what is the actual distance between the cities?
Answers: 3
Do you know the correct answer?
Introduction all of you have had at least an introduction to earned value management in the project...

Questions in other subjects: