Mathematics, 26.11.2019 18:31, garacey241
The main task is to be able to predict the distribution of the total project completion time (which is the sum of the 15 individual operation times). assuming that we have a large enough number of operations (note that 15 may not be large enough), using central limit theorem we can predict that the total project completion time will be distributed according to a distribution with mean and variance .
Answers: 2
Mathematics, 21.06.2019 15:30, allysongonzalezlove0
Two blends of tea are mixed to make a blend that will be sold at the fair. black tea sells for $2.20 per pound and orange pekoe tea sells for $3.00 per pound. how much of each should be used to obtain a 4lb blend selling for $2.50 per pound?
Answers: 1
Mathematics, 21.06.2019 16:20, amortegaa805
Which best explains why this triangle is or is not a right triangle?
Answers: 1
Mathematics, 21.06.2019 16:30, RoyalGurl01
Gail is making costumes for a school play. each rabbit costume needs one and one half yards of white fur fabric, a yard of blue striped fabric, and a quarter of a yard of pink felt for the ears. g? ail needs to make eight rabbit man yards will she need, for the white fur fabric, blue striped fabric, and pink felt?
Answers: 1
The main task is to be able to predict the distribution of the total project completion time (which...
Social Studies, 31.07.2019 13:30
Business, 31.07.2019 13:30
Physics, 31.07.2019 13:30
Business, 31.07.2019 13:30
Biology, 31.07.2019 13:30