Mathematics
Mathematics, 26.11.2019 06:31, Deascry

Parts arrive at a two-machine system according to an exponential interarrival distribution with mean 20 minutes. upon arrival, the parts are sent to machine 1 and processed. the processing-time distribution is tria (4.5, 9.3, 11) minutes. the parts are then processed at machine 2 with a processing-time distribution as tria (16.4, 19.1, 20.8) minutes. the parts from machine 2 are directed back to machine 1 to be processed a second time (same processing-time distribution but an independent draw from it). the completed parts then exit the system. run the simulation for a single replication of 20,000 minutes to observe the average number in the machine queues and the average part cycle time with arena model

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:00, candicecorvette
Check all that apply. f is a function. f is a one-to-one function. c is a function. c is a one-to-one function.
Answers: 3
image
Mathematics, 21.06.2019 23:30, carterkelley12oz0kp1
In the diagram, ab is tangent to c, ab = 4 inches, and ad = 2 inches. find the radius of the circle.
Answers: 3
image
Mathematics, 22.06.2019 01:00, vanenav2003ovf1lz
Drag statements and reasons to each row to show why the slope of the line between d and e is the same as the slope between e and f, given that triangles a and b are similar.
Answers: 2
image
Mathematics, 22.06.2019 01:30, cesarcastellan9
Add: (6x^2-5x+3) + (3x^3+7x-8) a. 9x^2+12x-5 b. 9x^2+2x+11 c. 9x^2+2x-5 d. 9x^2-2x+5
Answers: 1
Do you know the correct answer?
Parts arrive at a two-machine system according to an exponential interarrival distribution with mean...

Questions in other subjects:

Konu
Arts, 08.04.2021 16:10
Konu
History, 08.04.2021 16:10