Mathematics, 22.11.2019 02:31, avavackity
The proprietor of midland construction company has to decide between two projects. he estimates that the first project will yield a profit of $170,000 with a probability of 0.7 or a profit of $130,000 with a probability of 0.3; the second project will yield a profit of $230,000 with a probability of 0.7 or a profit of$80,000 with a probability of 0.3.
find the expected profit for each project.
first project = ?
second project = ?
Answers: 2
Mathematics, 21.06.2019 15:50, winterblanco
Which of the following is the equation that says that the product of a number and ten is equal to 20 percent of that number ? a) 10n= 2.0n b) 10+n=.20n c) n+ .20n=10 d) 10n=0.20n
Answers: 1
Mathematics, 21.06.2019 17:30, ninaaforever
The sum of two numbers is 12 and their difference is 18 what are the two numbers
Answers: 1
Mathematics, 21.06.2019 20:30, yfgkeyonna
On a cm grid, point p has coordinates (3,-1) and point q has coordinates (-5,6) calculate the shortest distance between p and q give your answer to 1 decimal place
Answers: 2
Mathematics, 21.06.2019 21:50, gamergladiator43
Tamar is measuring the sides and angles of tuv to determine whether it is congruent to the triangle below. which pair of measurements would eliminate the possibility that the triangles are congruent
Answers: 1
The proprietor of midland construction company has to decide between two projects. he estimates that...
Mathematics, 10.02.2021 04:10
Mathematics, 10.02.2021 04:10
Mathematics, 10.02.2021 04:10
Computers and Technology, 10.02.2021 04:10
Biology, 10.02.2021 04:10