Mathematics
Mathematics, 11.11.2019 18:31, jfox8741

Astudy was conducted in order to estimate ? , the mean number of weekly hours that u. s. adults use computers at home. suppose a random sample of 81 u. s. adults gives a mean weekly computer usage time of 8.5 hours and that from prior studies, the population standard deviation is assumed to be ? = 3.6 hours. based on this information, what would be the point estimate for ) 81(b) 8.5(c) 3.6(d) none of the above. we are 95% confident that the mean number of weekly hours that u. s. adults use computers at home is: (a) between 8.1 and 8.9.(b) between 7.8 and 9.2.(c) between 7.7 and 9.3.(d) between 7.5 and 9.5.(e) between 7.3 and 9.7.which of the following will provide a more informative (i. e., narrower) confidence interval than the one in problem 3? (a) using a sample of size 400 (instead of ) using a sample of size 36 (instead of ) using a different sample of size 81.(d) using a 90% level of confidence (instead of 95%) using a 99% level of confidence (instead of 95%) both (a) and (d) are correct.(g) both (a) and (e) are correct. how large a sample of u. s. adults is needed in order to estimate ? with a 95% confidence interval of length 1.2 hours? (a) 6(b) 12(c) 20(d) 36(e) 144

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:40, kathrynway9438
Imagine a new pasture with grass growing on it. every day after the seeds have germinated, the number of blades of grass in the pasture triples. after 18 days, the entire pasture is completely covered in grass. how many days did it take for the pasture to be one-third covered in grass?
Answers: 2
image
Mathematics, 21.06.2019 16:20, lethycialee2427
Taking algebra two apex courses and need with these questions
Answers: 1
image
Mathematics, 21.06.2019 20:00, Cassandoo
Select the number of ways in which a line and a circle can intersect
Answers: 3
image
Mathematics, 21.06.2019 20:20, Kelbee781
Each person in an it department of 25 people works on at least one of 3 major projects: system security, program implementation, platform development. 10 people work on system security, 13 work on program implementation, and 12 work on platform development. 4 people work on system security and platform development, 5 people work on program implementation and platform development, and 2 people work on all three projects. how many people work on system security and program implementation?
Answers: 1
Do you know the correct answer?
Astudy was conducted in order to estimate ? , the mean number of weekly hours that u. s. adults use...

Questions in other subjects:

Konu
Computers and Technology, 04.02.2021 20:50