Suppose that the design engineering team set the specifications for length of a stamped sheet-metal part at 10 inches (d) with acceptable tolerances of ±.05 inches (usl and lsl). the average length of the products produced by the actual stamping process is 9.99 inches (m) with a standard deviation of .015 inches (s). the calculations for the cp and cpk are as follows: a. cp = (10.05-9.95)/6(.015) = .10/.09 = 1.11b. k = (10 – 9.99)/((10.05-9.95)/2) = .01/.05 = .20
c. cpk = 1.11 (1-.20) = 1.11(.8) = .88

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, adreyan3479
Combined megan and kelly worked 60 hours. kelly worked twice as many hours as megan. how many hours did they each worked?
Answers: 3
image
Mathematics, 21.06.2019 18:10, normahernandez977
Find the solution set of this inequality. enter your answer in interval notation using grouping symbols. |8x-4| ≤ 12
Answers: 1
image
Mathematics, 21.06.2019 19:30, Davon21
If the ratio of sum of the first m and n terms of an ap is m2 : n2 , show that the ratio of its mth and nth terms is (2m − 1) : (2n − 1).
Answers: 3
image
Mathematics, 21.06.2019 23:30, f13vsdbd
Select all expressions that are equivalent to 2(3x + 7y). question 1 options: 6x + 14y 6x + 7y 1(6x + 14y)
Answers: 3
Do you know the correct answer?
Suppose that the design engineering team set the specifications for length of a stamped sheet-metal...

Questions in other subjects:

Konu
Mathematics, 04.11.2020 20:00
Konu
Mathematics, 04.11.2020 20:00
Konu
English, 04.11.2020 20:00