Mathematics
Mathematics, 08.11.2019 05:31, Nigward666

Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours in the assembly department, and 2760 in the finishing department. manufacturing a chair requires 0.9 hour of cutting, 0.6 hour of assembly, and 0.5 hour of finishing. a cabinet requires 0.2 hour of cutting, 0.8 hour of assembly, and 0.6 hour of finishing. a buffet requires 0.4 hour of cutting, 0.5 hour of assembly, and 0.3 hour of finishing. how many chairs, cabinets, and buffets should be produced in order to use all the available production capacity?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, lizzynmk
Which set of reflections would carry trapezoid abcd onto itself? a) x-axis, y=x, y-axis, x-axis b) x-axis, y-axis, x-axis c) y=x, x-axis, x-axis d) y-axis, x-axis, y-axis, x-axis
Answers: 2
image
Mathematics, 21.06.2019 19:40, spiritcampbell56
What is the range of the function? f(x)=-2|x+1|? a. all real numbers. b. all real numbers less than or equal to 0. c. all real numbers less than or equal to 1. d. all real numbers greater than or equal to 1
Answers: 2
image
Mathematics, 21.06.2019 20:00, PerksInLife
The function models the number of accidents
Answers: 1
image
Mathematics, 21.06.2019 20:00, JaredO
Plot the intercepts to graph the equation
Answers: 1
Do you know the correct answer?
Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours...

Questions in other subjects:

Konu
Mathematics, 01.04.2021 03:30