Mathematics, 08.11.2019 05:31, Nigward666
Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours in the assembly department, and 2760 in the finishing department. manufacturing a chair requires 0.9 hour of cutting, 0.6 hour of assembly, and 0.5 hour of finishing. a cabinet requires 0.2 hour of cutting, 0.8 hour of assembly, and 0.6 hour of finishing. a buffet requires 0.4 hour of cutting, 0.5 hour of assembly, and 0.3 hour of finishing. how many chairs, cabinets, and buffets should be produced in order to use all the available production capacity?
Answers: 1
Mathematics, 21.06.2019 19:40, spiritcampbell56
What is the range of the function? f(x)=-2|x+1|? a. all real numbers. b. all real numbers less than or equal to 0. c. all real numbers less than or equal to 1. d. all real numbers greater than or equal to 1
Answers: 2
Afurniture factory has 2840 machine hours available each week in the cutting department, 3760 hours...
Mathematics, 01.04.2021 03:30
English, 01.04.2021 03:30
Chemistry, 01.04.2021 03:30