Provide an appropriate response. in order to efficiently bid on a contract, a contractor wants to be 95% confident that his error is less than two hours in estimating the average time it takes to install tile flooring. previous contracts indicate that the standard deviation is 4.5 hours. how large a sample must be selected?
a.19
b.4
c.5
d.20

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, mostman077
Solve the following inequalities and show the solution on a number line. 3/4 (2x-7) ≤ 5
Answers: 1
image
Mathematics, 21.06.2019 20:00, cduke1919
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
image
Mathematics, 21.06.2019 20:30, allimaycatp8qgaq
Secant ac and bd intersect at point e inside f what is the measure of aed if measurements cd equals 30 a b is 50 and cb is 170
Answers: 1
image
Mathematics, 21.06.2019 22:00, iamsecond235p318rq
Find the greatest common factor of the followig monomials 46g^2h and 34g^6h^6
Answers: 1
Do you know the correct answer?
Provide an appropriate response. in order to efficiently bid on a contract, a contractor wants to be...

Questions in other subjects: