Mathematics
Mathematics, 22.10.2019 21:00, dierra09

Cooke corporation reports that at an activity level of 7,000 units, the total variable cost is $590,730, and the total fixed cost is $372,750. what would be the total cost, both fixed and variable, at an activity level of 7,100 units? assume that this level of activity is within the relevant range. a) $963,480 b) $977,244 c) $971,919 d) $970,362

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, ezapata21
You are making a battery for a science project. you have copper wire for your first electrode. you need to choose a conductor, a second electrode, and a device to plug into your battery. you have already chosen a lemon conductor. complete each statement below about the options that include a lemon conductor.
Answers: 2
image
Mathematics, 21.06.2019 21:10, mauricio18s
Determine the solution for mc001-1.jpeg
Answers: 1
image
Mathematics, 21.06.2019 22:00, sarahnd6907
Prove sin2a + cos2a - 1 / sin2a + cos2a + 1 = 1 - tana / 1 + cota
Answers: 2
image
Mathematics, 21.06.2019 23:00, jholland03
Given the expression (7 ? 4i) ? (2 + 6i), perform the indicated operation and write the answer in the form a + bi.
Answers: 1
Do you know the correct answer?
Cooke corporation reports that at an activity level of 7,000 units, the total variable cost is $590,...

Questions in other subjects: