Mathematics
Mathematics, 16.10.2019 00:00, sindy35111

During finals week, students arrive randomly at the desk of the computer lab. there is only one technician due to budget cuts, and the time required to provide service varies from student to student. the average arrival rate is 15 students per hour, and the average service rate is 20 students per hour. assuming standard waiting line distribution parameters hold. the administration finally increases the budget for the computer lab after numerous student protests, and the lab hires another technician who works at the same rate as the first technician. what is the average waiting time per student with the 2 technicians working at the same time? assume the students form a single line at the desk, and continue to arrive at the average rate of 15/hr." 9 min 0.9 min 4.5 min impossible to tell without additional information

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:30, sidney2602
Consider the function f(x)=-5x+3 what is f(-2)
Answers: 2
image
Mathematics, 21.06.2019 22:30, habah2062
I’ve been trying all day to figure this puzzle out. i need the work for it aswell. it is a factoring polynomials tarsia. the image is below.
Answers: 3
image
Mathematics, 21.06.2019 23:40, ggjhuvth
Identify the parent function that can be used to graph the function f(x)=3(x-9)2
Answers: 1
image
Mathematics, 21.06.2019 23:40, averycipher
Which point-slope form equation represents a line that passes through (3,-2) with a slope of -4/5
Answers: 1
Do you know the correct answer?
During finals week, students arrive randomly at the desk of the computer lab. there is only one tec...

Questions in other subjects:

Konu
Mathematics, 17.12.2020 21:00
Konu
Mathematics, 17.12.2020 21:00