Mathematics
Mathematics, 21.08.2019 18:30, allendraven89pds755

Bob and james are finishing the roof of a house =. working alone, bob can shingle the roof in 10 hours. james can shingle the roof in 16 hours. how long will it take them working together to shingle the roof? round your answer to the nearest hundredth if necessary.
a) 13 hours
b) 26.67 hours
c) 6.15 hours
d) 0.04 hours

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, Xghoued2056
Apark is in the shape of a rectangle. the park authorities are planning to build a 2-meter-wide jogging path in the park (shown as the shaded region in the image). what is the area of the jogging path? plz
Answers: 1
image
Mathematics, 21.06.2019 22:00, Jrstx333
Asquare and an equilateral triangle have the same perimeter. each side the triangle is 4 inches longer than each side of the square. what is the perimeter of the square
Answers: 1
image
Mathematics, 22.06.2019 03:00, sylvia47
Plz ! define the type of sequence below. -2,0,2,4,6 a. both arithmetic and geometric b. arithmetic c. neither arithmetic nor geometric d. geometric
Answers: 1
image
Mathematics, 22.06.2019 04:00, mariaramirez013
The function below is written in vertex form or intercept form. rewrite them in standard form and show your work. y = -3(x-2)(x-4)
Answers: 2
Do you know the correct answer?
Bob and james are finishing the roof of a house =. working alone, bob can shingle the roof in 10 hou...

Questions in other subjects: