You have just used the network planning model and found the critical path length is 30 days and the variance of the critical path is 25 days. the probability that the project will be completed in 33 days or less is equal to (2 decimal accuracy)
a. 0.73 b. 0.55.c. 0.12 d. 0.27 e. 0.60.
Answers: 2
Mathematics, 21.06.2019 15:30, babygirl226
Acircular city park has a sidewalk directly through the middle that is 111 - feet long. if each bag of fertilizer covers 50 square feet, then determine how many bags of fertilizers the parks and recreation department needs to use to cover the circular park. ignore all the sidewalks around and through the park.