Mathematics, 17.09.2019 21:30, waterdrop026
Acompany manufactures an assembly consisting of a frame, a shaft, and a ball bearing. the company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. each shaft must be processed on a forging machine, a lathe, and a grinder. these operations require 0.6 hour, 0.3 hour, and 0.4 hour per shaft, respectively. each frame requires 0.8 hour on a forging machine, 0.2 hour on a drilling machine, 0.3 hour on a milling machine, and 0.6 hour on a grinder the company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 illers. assume that each machine operates a maximum of 2400 hours per year. formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.
Answers: 1
Mathematics, 21.06.2019 20:30, lemusanaisabel6064
What is negative 3/9 times negative 2/8 ?
Answers: 1
Mathematics, 21.06.2019 21:00, mccdp55
Select the correct answer from each drop-down menu. a system of equations and its solution are given below. system a complete the sentences to explain what steps were followed to obtain the system of equations below. system b to get system b, the equation in system a was replaced by the sum of that equation and times the equation. the solution to system b the same as the solution to system a.]
Answers: 1
Mathematics, 21.06.2019 22:00, kimberlylove387
Iām confused on how to work the pie charts
Answers: 2
Acompany manufactures an assembly consisting of a frame, a shaft, and a ball bearing. the company ma...
Mathematics, 05.05.2020 00:57
Mathematics, 05.05.2020 00:57
Mathematics, 05.05.2020 00:57
History, 05.05.2020 00:57