Mathematics, 14.09.2019 03:30, hoolio75
One batch of 25 units requires the following processing times per unit: move time for raw materials to cutting department, 6 minutes; cutting department, 4 minutes; move time to sewing department, 3 minutes; sewing department, 10 minutes; move time to packaging department, 2 minutes; and packaging department, 4 minutes. a. how much of the time spent to produce the units is value-added time? b. determine the total within-batch wait time. c. calculate the total lead time for the batch.
Answers: 2
Mathematics, 21.06.2019 17:00, sciencecreation87
Two planes leave an airport at the same time, one flying east, the other flying west. the eastbound plane travels 20 mph slower. they are 1600 mi apart after 2 hr. find the speed of each plane.
Answers: 1
Mathematics, 21.06.2019 20:30, violetagamez2
Answer for 10 points show work you guys in advanced < 3
Answers: 1
One batch of 25 units requires the following processing times per unit: move time for raw materials...
English, 22.10.2020 23:01
Mathematics, 22.10.2020 23:01
Mathematics, 22.10.2020 23:01
Mathematics, 22.10.2020 23:01
Mathematics, 22.10.2020 23:01
Mathematics, 22.10.2020 23:01