Mathematics
Mathematics, 14.09.2019 03:30, hoolio75

One batch of 25 units requires the following processing times per unit: move time for raw materials to cutting department, 6 minutes; cutting department, 4 minutes; move time to sewing department, 3 minutes; sewing department, 10 minutes; move time to packaging department, 2 minutes; and packaging department, 4 minutes. a. how much of the time spent to produce the units is value-added time? b. determine the total within-batch wait time. c. calculate the total lead time for the batch.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, sciencecreation87
Two planes leave an airport at the same time, one flying east, the other flying west. the eastbound plane travels 20 mph slower. they are 1600 mi apart after 2 hr. find the speed of each plane.
Answers: 1
image
Mathematics, 21.06.2019 19:00, TakeNotes
Abag of jelly beans contain 13 pink, green, 20 yellow, 10 black, 7 red, and 11 orange jelly beans. approximately what percent of the jelly beans are pink and yellow?
Answers: 1
image
Mathematics, 21.06.2019 19:30, 19King73
Select the margin of error that corresponds to the sample mean that corresponds to each population: a population mean of 360, a standard deviation of 4, and a margin of error of 2.5%
Answers: 2
image
Mathematics, 21.06.2019 20:30, violetagamez2
Answer for 10 points show work you guys in advanced < 3
Answers: 1
Do you know the correct answer?
One batch of 25 units requires the following processing times per unit: move time for raw materials...

Questions in other subjects:

Konu
Mathematics, 22.10.2020 23:01
Konu
Mathematics, 22.10.2020 23:01