Mathematics
Mathematics, 22.07.2019 22:20, dayaan009

Some years ago it was estimated that the demand for steel approximately satisfied the equation p=134-10x, and the total cost of producing x units of steel was upper c left parenthesis x right parenthesis equals 145 plus 40 x. (the quantity x was measured in millions of tons and the price and total cost were measured in millions of dollars.) determine the level of production and the corresponding price that maximize the profits.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:30, honey66
Chip worked at the animal shelter for 6 hours each week for several weeks. he worked for a total of 42 hours. which of the following can be used to find the number of weeks chip worked at the animal shelter?
Answers: 1
image
Mathematics, 21.06.2019 13:40, harleyy6802
What is the correlation coefficient for the data? don't forget to turn the diagnoisticon (in the catalog menu of the calculator). r = answer (round to the nearest thousandth)
Answers: 1
image
Mathematics, 21.06.2019 15:00, aubreerosehennessy95
55 bridesmaids want to make 325 325 decorations for a wedding. each decoration takes about 212 2 1 2 minutes to make. which response gives the best estimate for the amount of time each bridesmaid will spend making decorations?
Answers: 2
image
Mathematics, 21.06.2019 15:30, mell45
The ratio pv to nrt is plotted against pressure for ch4 at 0°c and 200°c. why does the curve for 0°c drop below the horizontal line for an ideal gas whereas the curve for 200°c does not?
Answers: 2
Do you know the correct answer?
Some years ago it was estimated that the demand for steel approximately satisfied the equation p=134...

Questions in other subjects:

Konu
Mathematics, 29.08.2020 21:01