Mathematics
Mathematics, 12.07.2019 21:30, jacob7542

Amanufacturing company produces two models of entertainment centers. model a requires 9 feet of molding and takes 2 hours to manufacture. model b needs 16 feet of molding and 4 hours to manufacture. in a given? week, the company has 134 hours of labor and 555 feet of molding available. solve the system and draw a graph of the solution set.
__ < or equal to 555
__ < or equal to 134

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:10, AdamFrost
Which of these sequences is a geometric sequence a 1,2,4, 7, 11, 16, 22. b. 2.4.8.14.22.38 c.3.6.9. 15.18,21 d. 3,9,27,81,243,729,
Answers: 1
image
Mathematics, 21.06.2019 19:20, joelpimentel
Which number line represents the solution set for the inequality - x 24?
Answers: 3
image
Mathematics, 22.06.2019 01:00, isabellecannuli
Asmall book publisher knows that 26 books weigh 41 lbs. how much do 40 books weigh?
Answers: 1
image
Mathematics, 22.06.2019 03:00, Peggy1621
Afitness center has 2 membership plans one has a low dollar sign up fee of 15 dollars and costs 38 dollars per month to join. a second plan has a higher sign up fee of 78 dollars but a lower monthly fee of 31 dollars for what number of days of the month is the coat the same
Answers: 1
Do you know the correct answer?
Amanufacturing company produces two models of entertainment centers. model a requires 9 feet of mold...

Questions in other subjects: