Mathematics
Mathematics, 05.07.2019 03:30, lololol270

In a learning curve application, 658.5 work hours are required for the third production unit and 615.7 work hours are required for the fourth production unit. determine the value of n (and therefore s) in the equation z u=k(u^n ), where u=the output unit number; z_=the number of input resource units to produce output unit u; k=the number of input resource units to produce the first output unit; s=the learning curve slope parameter expressed as a decimal (s=0.9 for a 90% learning curve); n=logā”s/logā”2 =the learning curve exponent.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, emmanuelcampbel
Jack has a piece of red ribbon that is two times as long as his piece of blue ribbon. he says that he can use two different equation to find out how long his piece of red ribbon is compared to his piece of blue ribbon is. is he correct? explain his reasoning
Answers: 1
image
Mathematics, 21.06.2019 20:10, lele142018
Which value of m will create a system of parallel lines with no solution? y = mx - 6 8x - 4y = 12
Answers: 3
image
Mathematics, 21.06.2019 23:00, daedae96
Answer this two poles, ab and ed, are fixed to the ground with the of ropes ac and ec, as shown: two right triangles abc and edc have a common vertex c. angle abc and edc are right angles. ab is labeled 13 feet, ac is labeled 15 feet, ec is labeled 10 feet, and ed is labeled 4 feet. what is the approximate distance, in feet, between the two poles? 11.14 feet16.65 feet14.35 feet15.59 feet
Answers: 1
image
Mathematics, 21.06.2019 23:00, tray71016
Alex measured the length of an item to be 3.7 cm. the actual length is 3.5 cm. what is alexā€™s percent error?
Answers: 2
Do you know the correct answer?
In a learning curve application, 658.5 work hours are required for the third production unit and 615...

Questions in other subjects:

Konu
Mathematics, 26.12.2020 04:40
Konu
Mathematics, 26.12.2020 04:40
Konu
English, 26.12.2020 04:40