Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line will operate 50 wk/yr, 10 shifts/wk, and 7.5 hr/shift. work units will be attached to a continuously moving conveyor. work content time is 58.0 min. assume line efficiency is 0.95, balancing efficiency is 0.93, and repositioning time is 8 sec. determine the actual number of workers required.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:10, morgantisch25
A. use the formula for continuous compounding with the original example: $1000 invested at 2% for 1 year. record the amount to 5 decimal places. use a calculator. b. compare it to the result using the original compound interest formula with n = 365 calculated to 5 decimal places. which has a larger value? explain.
Answers: 1
image
Mathematics, 21.06.2019 21:00, daynafish13
Which expressions are equivalent to -7+3(-4e-3)? choose all answers that apply: choose all answers that apply: a -4(3e+4)? 4(3e+4) b 12e12e c none of the above
Answers: 2
image
Mathematics, 21.06.2019 22:30, miami158999
Agallon of apple juice cost $7 a pack of eight 4.23oz box of apple juice $2.39 which is a better deal
Answers: 1
image
Mathematics, 21.06.2019 23:00, erbnichole
Graph the system of equations on your graph paper to answer the question. {y=−x+4y=x−2 what is the solution for the system of equations? enter your answer in the boxes.
Answers: 1
Do you know the correct answer?
Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line w...

Questions in other subjects: