Mathematics, 30.06.2019 06:30, thanitoast84
Ka - ö © 1 6.4.3 test (cst): data and mathematical modeling a company produces items in small batches. the machinery needs to warm up before the items can be produced. the scatterplot shows the time needed to produce batches of different numbers of items. production time (minutes) (5.60) items produced based on the line of best fit, which of these statements is true? o a. it takes about 20 minutes for the equipment to warm up. o b. as the number of items in a batch increases by 1, the production time increases by 20 minutes. o c. it takes about 60 minutes for the equipment to warm up. o d. as the number of items in a batch increases by 1, the production time increases by 12 minutes previous
Answers: 2
Mathematics, 21.06.2019 20:00, claudia3776
What does the sign of the slope tell you about a line?
Answers: 2
Ka - ö © 1 6.4.3 test (cst): data and mathematical modeling a company produces items in small batch...
Health, 17.08.2019 17:20