In a factory, a certain machine needs 10 min to warm up. it takes 15 min for the machine to run a cycle. the machine can operate for as long as 6 h per day including warm up time. draw a graph showing the total time the machine operates during 1 day as a function of the number of cycles it runs. -what domain and range are reasonable? -is the function a linear function?