Mathematics, 07.07.2019 16:00, smartperraorwhateva
Aplumbing contractor bid the rough-in work for a new three-story office building based an estimate of 850 hours of a journey-level plumber's time on the job. after the job was in progress, the contractor determined that the first floor required 342 hours and the second floor required 329 hours. how many labor hours are left in the estimate to complete the third floor?
Answers: 1
Mathematics, 21.06.2019 18:30, angelina6836
Anormally distributed data set has a mean of 176.3 and a standard deviation of 4.2. what is the approximate z-score for the data value of 167.9? 2.00 −2.00 8.4 −8.4
Answers: 2
Mathematics, 21.06.2019 19:00, jamilamiller200
Solve 3x-18=2y and 5x-6y=6 by elimination show work
Answers: 2
Mathematics, 22.06.2019 00:20, yoyo80431
Sherrie is baking a pie for her family. she leaves the room and comes back to 35% of the pie having been eaten before she can put the topping on. how much 1 square inch strips of dough will she need for the top, now that a portion is missing? round your answer to the nearest while nimber.
Answers: 1
Aplumbing contractor bid the rough-in work for a new three-story office building based an estimate o...
Mathematics, 08.01.2021 05:10
English, 08.01.2021 05:10
History, 08.01.2021 05:10