Mathematics
Mathematics, 12.07.2019 15:00, leothedrifter

Working at their respective constant rates, machine a makes 100 copies in 12 minutes and machine b makes 150 copies in 10 minutes. if these machines work simultaneously at their respective rates for 30 minutes, what is the total number of copies that they will produce? (a) 250 (b) 425 (c) 675 (d) 700 (e) 750

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, averyeverdeen01
Pam buys a sleeve of ball bearings for her skateboard. each of the bearings is 1 1/5 inches wide. the sleeve is 9 3/5 inches long. how many ball bearings are in the sleeve? show your work.
Answers: 3
image
Mathematics, 21.06.2019 18:00, granniejo
You spin the spinner shown below once. each sector shown has an equal area. what is p(beaver ) p(beaver)? if necessary, round your answer to 2 2 decimal places.
Answers: 2
image
Mathematics, 21.06.2019 19:30, uchapman6286
What is the lcm of 16 and 40 ? 24 and 40 ?
Answers: 2
image
Mathematics, 21.06.2019 19:30, cody6187
Agroup of randomly selected apple valley high school students were asked to pick their favorite gym class. the table below shows the results of the survey. there are 528 students at apple valley high school. gym class number of students racquet sports 1 team sports 9 track and field 17 bowling 13 based on the data, what is the most reasonable estimate for the number of students at apple valley high school whose favorite gym class is bowling? choose 1 answer a. 9 b. 13 c. 119 d. 172
Answers: 1
Do you know the correct answer?
Working at their respective constant rates, machine a makes 100 copies in 12 minutes and machine b m...

Questions in other subjects:

Konu
Mathematics, 12.10.2020 01:01
Konu
English, 12.10.2020 01:01