Answers: 1
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:00, gerardoblk5931
Question 10 of 211 pointuse the elimination method to solve the system of equations. choose thecorrect ordered pair.10x +2y = 643x - 4y = -36a. (4,12)b. (-3, 11)c. (2,10)d. (-5, 8)
Answers: 1
Mathematics, 22.06.2019 06:00, 21121212cutecheytown
Classify the triangle by its sides and angles. a equilateral b isosceles acute c isosceles right or d scalene acute
Answers: 1
What is the value of a in a/7.4 = 6.79...
Spanish, 13.11.2020 21:50
Biology, 13.11.2020 21:50
Mathematics, 13.11.2020 21:50
Biology, 13.11.2020 21:50
Mathematics, 13.11.2020 21:50
English, 13.11.2020 21:50