English
English, 01.06.2021 14:00, mollietennis

READ THE PASSAGE CAREFULLY AND ANSWER THE QUESTIONS The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents," long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on.

The pattern of the pipeline's up-and-down route is often determined by the harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil.

One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so eight major oil companies formed a consortium in order to share the costs. Each company controls oil rights to a particular share of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortages, equipment breakdowns, labor disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.

Which phrase in the first paragraph mean ‘Supported by’?
According to the last paragraph, determines what percentage of the construction costs each member of the consortium would pay.

answer
Answers: 2

Other questions on the subject: English

image
English, 21.06.2019 23:30, EricaLSH7624
Which of these statements is evaluative in nature a) the short passage creates a brilliant and sketch of gabriel b) resulting from the fact that gabriel is observant, he is also reflective c) the way gabriel looks at his wife shows that he is a detached onlooker d) that gabriel is observant is evident from the minute details he notices
Answers: 3
image
English, 22.06.2019 06:20, blaze9889t
Which best explains how this excerpt creates suspense it develops the plot using dialogue instead of description. it explains that the fishermen have found two graves on the island. it shows that manjiro is a character who asks a lot of questions. it includes a question that the reader will want to know the answer to.
Answers: 3
image
English, 22.06.2019 07:30, maddylol3863
Which characteristic of james baldwin’s “notes of a native son” qualify as a work of literary nonfiction
Answers: 1
image
English, 22.06.2019 09:30, marbuscis99
In about one hundred words, discuss two ways through which an author can show how a theme develops. consider how themes reveal culture.
Answers: 1
Do you know the correct answer?
READ THE PASSAGE CAREFULLY AND ANSWER THE QUESTIONS The Alaska pipeline starts at the frozen edge o...

Questions in other subjects:

Konu
History, 09.10.2020 06:01
Konu
Mathematics, 09.10.2020 06:01