Answers: 3
English, 22.06.2019 03:20, india73
What task did the surveyors do? a. they studied the landscape to determine the most direct route for building a road. b. they designed treadmills that lifted blocks of stone to where they were needed. c. they dug trenches and filled them with sand, concrete, and large blocks to form a road.
Answers: 1
Change l wish everybody well into present tense...
English, 29.06.2019 09:30
Mathematics, 29.06.2019 09:30
Mathematics, 29.06.2019 09:30
Business, 29.06.2019 09:30
Mathematics, 29.06.2019 09:30