Which of the following requires formwork?
A) precast concrete construction
B) cast-in-place...
Engineering, 07.02.2022 03:30, tiarafaimealelei
Which of the following requires formwork?
A) precast concrete construction
B) cast-in-place construction
c) pre-stressed concrete
D) masonry
Answers: 3
Engineering, 04.07.2019 18:10, abdirahmansoloman
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
Mathematics, 22.12.2020 01:00
Mathematics, 22.12.2020 01:00
Mathematics, 22.12.2020 01:00
Mathematics, 22.12.2020 01:00
Mathematics, 22.12.2020 01:00
Mathematics, 22.12.2020 01:00
English, 22.12.2020 01:00