Engineering
Engineering, 25.01.2022 14:00, shelbylynn17

This task requires you to produce a partial estimate for a residential project. The estimate isto be prepared for use in a tender process and must include all preliminary and site costs. Your estimate should be based on determining detailed costs for three major trades. TheseCould include bricklayers, carpenters, painters, plumbers or electricians. If you are unsureWhether the trade you have chosen is considered as a major trade, ask your assessor forAdvice. In preparing the estimate, you must:

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, settasav9641
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
image
Engineering, 04.07.2019 18:10, lerasteidl
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
Do you know the correct answer?
This task requires you to produce a partial estimate for a residential project. The estimate isto be...

Questions in other subjects:

Konu
History, 17.06.2021 07:10