A 2 HP, 120 V, single phase motor requires a inverse time circuit breaker branch circuit short circuit and ground fault protective device. The motor has a nameplate FLC of 22.1 amperes.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, theamandawhite
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
image
Engineering, 04.07.2019 18:20, AnonymousLizard52303
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
image
Engineering, 04.07.2019 19:10, babas97
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
image
Engineering, 04.07.2019 19:10, ndaha
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
Do you know the correct answer?
A 2 HP, 120 V, single phase motor requires a inverse time circuit breaker branch circuit short circ...

Questions in other subjects:

Konu
Social Studies, 12.04.2021 17:20
Konu
Arts, 12.04.2021 17:20
Konu
Mathematics, 12.04.2021 17:20