Engineering, 04.12.2021 22:10, eeeeee7891
Respecto a los métodos “puros” de plan agregado, ¿cuál de ellos podría generar inventarios faltantes?
Subcontratación.
Plan mixto.
Producción exacta.
Variación de inventario.
Horas extras
Answers: 1
Engineering, 04.07.2019 18:10, redrosesxx
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
Engineering, 04.07.2019 19:10, rayne40
A)-in the process of engineering design, explain the contribution of material selection. b)- explain the procedure of synthesis as is employed in engineering design. c)- is there any relationship between ergonomics and engineering design? explain. d)- safety consideration in engineering design includes human, product and the enviroment . explain how safety will be incorporated into the design?
Answers: 3
Respecto a los métodos “puros” de plan agregado, ¿cuál de ellos podría generar inventarios faltantes...