Engineering
Engineering, 02.12.2021 19:50, leandrogarin37p2g5ds

Ermal Is a project manager for a new housing development. He is in charge of making sure that 400 residences are completed soundly and on time. What skill would be useful to Ermal in his career?


Ermal Is a project manager for a new housing development. He is in charge of making sure that 400 r

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, michellerosas
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
image
Engineering, 04.07.2019 18:10, oshawn108
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg. k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m. k
Answers: 2
image
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
image
Engineering, 04.07.2019 18:10, krystabrewer3
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Do you know the correct answer?
Ermal Is a project manager for a new housing development. He is in charge of making sure that 400 re...

Questions in other subjects:

Konu
Mathematics, 25.06.2019 07:10
Konu
English, 25.06.2019 07:10