8. Block A shown in the figure below weighs 2000 N. The chord attached to A passes over a fixed drum and supports a weight equal to 800 N. The coefficient of friction between A
and the horizontal plane is 0.25 and between the rope and the fixed drum is 0.1. Solve for
P when (a) motion is impending towards the left and (b) motion is impending towards the
right.
800 N
30°
P+
A
cs Scanner with Cam anner

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, dval1146
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
image
Engineering, 04.07.2019 19:20, dndndndnxmnc
The process in which the system pressure remain constant is called a)-isobaric b)-isochoric c)-isolated d)-isothermal
Answers: 3
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
image
Engineering, 06.07.2019 02:30, chickennbutt0730
On solidification from a melt, the polymer polyethylene forms a semi-crystalline spherulite structure. (i) sketch an individual spherulite and label the amorphous and crystalline regions. (ii) draw a schematic to show the changes in specific volume with temperature during cooling from the melt, comparing it to the theoretical extremes of fully crystalline and fully amorphous (indicate tm and tg)
Answers: 2
Do you know the correct answer?
8. Block A shown in the figure below weighs 2000 N. The chord attached to A passes over a fixed dr...

Questions in other subjects: