Engineering
Engineering, 23.10.2021 20:50, wardlawshaliyah

Guardrail systems must be built to withstand at least:

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
image
Engineering, 04.07.2019 19:10, moneyyfletcher
The air in an automobile tire with a volume of 0.015 m3 is at 32°c and 140 kpa gage. determine the amount of air that must be added to raise the pressure to the recommended value of 206 kpa gage. assume the atmospheric pressure to be 128 kpa and the temperature and the volume to remain constant.[r-0.287 kj/kgk]
Answers: 3
image
Engineering, 04.07.2019 19:20, holaadios222lol
Apiping systems consists of 6 m of 6-std type k and 12 m of 4-std type k, both drawn copper tubing. the system conveys ethylene glycol at a rate of 0.013 m3/s. the pressure drop across the system is to be calculated. there are two 90° elbows in the 6-in pipe, a reduction from the 6-in pipe to the 4-in pipe and four 90° elbows in the 4-in pipe. all fittings are soldered (same as flanged) and regular. the inlet and outlet of the system are at the same height.
Answers: 1
image
Engineering, 04.07.2019 19:20, kaitlyn114433
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
Do you know the correct answer?
Guardrail systems must be built to withstand at least:...

Questions in other subjects:

Konu
Mathematics, 11.03.2021 04:10
Konu
History, 11.03.2021 04:10