Engineering
Engineering, 09.10.2021 14:50, vett072804

3)A steel plant is to be constructed at a site where cooling water can be taken from a groundwater aquifer. It is planned to discharge the used cooling water to a small river. Summer flows and temperatures have historically ranged from 25 to 40 m3/s and 15 to 22 oC, respectively. The TCEQ has set a maximum stream temperature requirement of 25oC below the proposed discharge. Groundwater temperature is known to be constant at 120C. Heat dissipation requirements are 2x108J/s. Determine the maximum groundwater flow rate required to meet TCEQ requirements in water temperature. (4pts)

answer
Answers: 1

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, makaylashrout77
Amass of 1.5 kg of air at 120 kpa and 24°c is contained in a gas-tight, frictionless piston-cylinder device. the air is now compressed to a final pressure of 720 kpa. during the process, heat is transferred from the air such that the temperature inside the cylinder remains constant. calculate the boundary work input during this process.
Answers: 2
image
Engineering, 04.07.2019 18:10, heidiburgos1own6c0
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 18:10, aliopqwas
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
image
Engineering, 04.07.2019 18:10, Larkinlover703
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
Do you know the correct answer?
3)A steel plant is to be constructed at a site where cooling water can be taken from a groundwater a...

Questions in other subjects:

Konu
Physics, 13.08.2021 14:00