Engineering
Engineering, 12.09.2021 06:20, maylasia

The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be 1.2. If the benefit is estimated at $520,000 per year and the maintenance cost is expected to total $320,000 per year, what is the allowed maximum initial cost of the project? The discount rate is 6.5% per year and a project life of 40 years is expected.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 12:10, Ryantimes2
On a average work day more than work place firs are reorted
Answers: 1
image
Engineering, 04.07.2019 18:10, ashleybaber4966
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
image
Engineering, 04.07.2019 18:10, redrosesxx
Water at 55c flows across a flat plate whose surface temperature is held constant at 95c. if the temperature gradient at the plate's surface for a given value of x is 18 c/mm, find a) local heat transfer coefficient. b) heat flux
Answers: 3
image
Engineering, 04.07.2019 18:10, juansoto227711
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
Do you know the correct answer?
The B/C ratio for a new flood control project along the bank of Chao Phraya River is required to be...

Questions in other subjects:

Konu
Mathematics, 17.06.2021 15:30
Konu
Mathematics, 17.06.2021 15:30