Engineering
Engineering, 26.08.2021 21:00, jessb4110

A backsight of 7.76 ft. is taken on a turning point with an elevation of 2,325.58 ft. If the foresight taken on the top of a construction pin is 4.25 ft., the elevation (ft.) of the top of the pin is most nearly:.A. 2,313.57B. 2,322.07C. 2,329.09D. 2,327.59

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, danksans7011
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
image
Engineering, 04.07.2019 18:10, hadellolo8839
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
image
Engineering, 04.07.2019 18:10, demarcuswiseman
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
image
Engineering, 04.07.2019 18:10, QueenLife4869
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
Do you know the correct answer?
A backsight of 7.76 ft. is taken on a turning point with an elevation of 2,325.58 ft. If the foresig...

Questions in other subjects:

Konu
Mathematics, 05.05.2020 23:11