The top-down method of estimating project time and costs that is useful for projects requiring the same task, group of tasks, or product repeated several times, especially if it is labor intensive, is the . a) function point
b) ratio
c) apportion
d) consensus
e) learning curves

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 18:10, bunnles
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:10, Talos02
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
image
Engineering, 04.07.2019 18:20, safiyabrowne7594
Ahe-xe mixture containing a 0.75 mole fraction of helium is used for cooling electronics in an avionics application. at a temperature of 300 k and atmospheric pressure, calculate the mass fraction of helium and the mass density, molar concentration and molecular weight of the mixture. if the cooling capacity is 10 l, what is the mass of the coolant?
Answers: 3
image
Engineering, 04.07.2019 19:10, pjgolden04
How to increase the thermal officiency of an ideal simple rankino cycle? among these methods, which one is the best and why?
Answers: 2
Do you know the correct answer?
The top-down method of estimating project time and costs that is useful for projects requiring the s...

Questions in other subjects:

Konu
Mathematics, 27.09.2020 08:01
Konu
Mathematics, 27.09.2020 08:01
Konu
Mathematics, 27.09.2020 08:01