Engineering
Engineering, 30.06.2021 15:40, mosleykimberly944

Partially automated scanner that reads the piece-goods vouchers costs about 1308900 to make it operational. Operating costs are projected to be around 655,500 per year. The scanner is expected to last for five years. The scanners net salvage value is 130,000, according to estimates. The new automated system is estimated to save birr 1,700,500 in labour cost per year calculate - net cash flow over the life of the scanner - what is the time frame for recouping your investment - if the interest rate is 15% after taxes, what would be the discount pay back period?

answer
Answers: 2

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 14:10, bryneosburn
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
image
Engineering, 04.07.2019 18:10, jadeochoa4466
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:10, 19deleonl
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
image
Engineering, 04.07.2019 18:10, caitlynnpatton1208
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
Do you know the correct answer?
Partially automated scanner that reads the piece-goods vouchers costs about 1308900 to make it opera...

Questions in other subjects:

Konu
Mathematics, 22.12.2021 18:10