Engineering, 23.06.2021 22:20, rockyroad19

Explain why the following scenario represents an inadequate risk management plan for a construction project. Situation: The detailed plan for construction of a new theater arts building includes a risk register that details likelihood of risks, consequences of risks, and necessary actions to assess and control the risks.

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 04.07.2019 16:10, Arealbot
The force on a cutting tool are 2600n vertically downward and 2100 horizontal. determine the resultant force acting on the tool and the angle at which it acts.
Answers: 1
image
Engineering, 04.07.2019 18:10, mm016281
What difference(s) did you notice using a pneumatic circuit over hydraulic circuit. explain why the pneumatic piston stumbles when it hits an obstacle.
Answers: 2
image
Engineering, 04.07.2019 18:10, viicborella
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
image
Engineering, 04.07.2019 18:20, miguel454545
Along 8-cm diameter steam pipe whose external surface temperature is 900c connects two buildings. the pipe is exposed to ambient air at 70c with a wind speed of 50 km/hr blowing across the pipe. determine the heat loss from the pipe per unit length. (b) air at 500c enters a section of a rectangular duct (15 cm x 20 cm) at an average velocity of 7 m/s. if the walls of the duct are maintained at 100c. a) the length of the tube for an exit temperature of the air to be 40 0c. b)the rate of heat transfer from the air. c) the fan power needed to overcome the pressure drop in this section of the duct.
Answers: 1
Do you know the correct answer?
Explain why the following scenario represents an inadequate risk management plan for a construction...