Engineering
Engineering, 11.06.2021 14:00, hellokitty1647

chart below, answer the following questions 40 2.00 6.00 8.00 10.00 12.00 14.00 16.00 Time left 0:41:27 5,000 0* 5,000 Haul 1 -10,000 15,000 Haul 2 Haul 3 -20,000 25,000 v 30,000 -35,000 At what stations we have Transitional Point(s)? choose all the correct answers Select one or more A 8+00 B. 11.00 EC 9+00 D.2-00 E 5-00 Given the mass diagram presented in the chart above What would be the appropnate machine for Haul 1? Select one or more D A Trucks B. Push-loaded scraper DC Large Dozer Given the mass diagram presented in the chart above At the end of the project, which of the following cases applies? Select one or more A The contractor needs to haul materials out of the site, B. The contractor needs to haul matenals into the site COMPANY

answer
Answers: 3

Other questions on the subject: Engineering

image
Engineering, 03.07.2019 15:10, EmilySerna
Heat is added to a piston-cylinder device filled with 2 kg of air to raise its temperature 400 c from an initial temperature of t1 27 cand pressure of pi 1 mpa. the process is isobaric process. find a)-the final pressure p2 b)-the heat transfer to the air.
Answers: 1
image
Engineering, 04.07.2019 18:10, michellerosas
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
image
Engineering, 04.07.2019 18:20, sarah7984
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
image
Engineering, 04.07.2019 18:20, maciemarklin79981
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
Do you know the correct answer?
chart below, answer the following questions 40 2.00 6.00 8.00 10.00 12.00 14.00 16.00 Time left 0:41...

Questions in other subjects:

Konu
Mathematics, 10.05.2020 08:57
Konu
History, 10.05.2020 08:57
Konu
Mathematics, 10.05.2020 08:57